Manufacturing Plant


  • September 2015

Project Description

This project consisted of a complete disposal of the existing system with a new built-up roof replacement. The built-up roof replacement consisted of four plies of fiberglass felt laminated together with type II asphalt bitumen. A 2% tapered fiberboard insulation slope system was also built into the design to add positive slope to the drains.